Electroosmotic dewatering MP-EDW
Electroosmotic dewatering MP-EDW
Electroosmotic sludge dewatering is a subsequent stage following mechanical dewatering.
Revolutionary, Eco-Friendly, & highly Efficient Solution - Electroosmotic sludge dewatering.
MP-EDW expands the possibilities for sludge management. Sludge with a dry solids content of 12-25 % can be further dewatered using this technology to 40-60 % (& up to 90% with tertiary treatment), depending on the type of sludge. Additionally, it ensures sludge hygienization, which is a necessary for further processing of the sludge, whether for incineration, composting, or soil fertilization.
Main Benefits:
- Cake volume reduction 40-70 %
- Content of dry solids outlet 40-60 % DS
- Sludge hygienization
- Minimal operational & investment costs
- Suitable for municipal & industrial applications (all electrically conductive sludges)
- Continuous & batch operation
Electroosmotic dewatering MP-EDW
Size calculator
Please input desired hydraulic flow and suspended solids content. Our calculator will suggest you optimum size of machine...
- WT primary sludge - raw sludge from activation (ČOV – surový kal z aktivace): 0,5–1%
- WWT secondary sludge - after final settling tank (ČOV – stabilizovaný, zahuštěný kal): 1,5–4 %
- Sludge from DAF (Kal z flotace): 2–4 %
- Biogas station sludges (Kaly z produkce bioplynu): 4–6 %
- Grease traps, oil separation (Lapáky tuku, olejové aplikace): 4-6%
Capacity of MP-DW - dry material flow per hour :
- MP-DW-131: 10 kg/h
- MP-DW-201: 30 kg/h
- MP-DW-301: 60 kg/h
- MP-DW-302: 120 kg/h
- MP-DW-401: 140 kg/h
- MP-DW-402: 280 kg/h
- MP-DW-403: 420 kg/h